CMT 209

03/19/09

Home
CMT 209
AET 110
MET 204
Feedback

 

Electrical and Mechanical Systems in a Building

Syllabus

Class Notes:

 8-21-07 Intro

 8-23-07 HVAC Equipment ch.. 8.2 & 3

 8-30-07  - HVAC Equipment continued

 9-4-07 ch. 6.2 - 6.7

 9-6-07 Heating Loads ch. 7.1 - 7.4

 9-11-07  Heating Loads ch. 7.5 - 7.9

 9-13-07 Cooling Load ch. 12

 9-18-07 Watch movie & end ch. 8

 9-20-07 Ch 9 Hydronic Design

Homework:

Assignment

Due Date

Solutions

Ch 8 1-12

9/4

 
ch.. 8 13 - 22 9/6  
Ch 6 29-31, 33, 35,4 6-50, 53 9/11  
Ch 7 25, 28,29, 34, 39, 43, 44, 46 9/13  
Ch 12 5, 12, 13, 17, 18, 22 9/20  

Projects:

Project 1- Hydronic Heating System Design

Project 2 - Forced Air Cooling System Design

Home | CMT 209 | AET 110 | MET 204 | Feedback

This site was last updated 10/01/07